A full gut renovation is the closest you get to a new house without tearing it down. Here is what it involves, the order of work, and how long it takes in Toronto.
What “full gut” means
We take the inside of the house back to the studs and the structure. Old plaster or drywall, wiring, plumbing, ductwork and insulation come out. New electrical, plumbing and HVAC go in, then insulation, drywall taped and left paint-ready, and all new finishes.
What we find behind the walls
In older Toronto houses we often find old wiring, galvanized plumbing, little or no insulation and past work done without permits. Opening everything up is the chance to fix all of it at once instead of patching it room by room.
The order of work, start to finish
- Demo and haul away
- Structural changes: beams, walls and openings
- Rough-in: plumbing, electrical and HVAC
- Inspections
- Insulation and vapour barrier
- Drywall, taped and left paint-ready
- Flooring, kitchen, bathrooms, trim and doors
- Paint, fixtures and final clean

What usually stays
The structure stays: the foundation, the outside walls and the floor framing, unless the design changes them. Stairs, original hardwood or trim can sometimes be kept and refinished if they’re in good shape and the owners want to keep them.
Upgrades to make while the walls are open
- Insulation in the exterior walls and attic, which older houses often barely have
- New windows, if they’re due
- A heating and cooling system sized for the house as it will be, not as it was
- Extra outlets, data wiring and lighting where you’ll actually use them
These cost much less now than after the drywall is up.
Permits and inspections
A full gut usually needs a building permit, because walls, structure, plumbing and heating all change. Electrical work is reported to ESA by a licensed electrical contractor, with an inspection before the walls are closed and a final one. We handle the permits and book the inspections.
Make your choices early
Kitchen, bathroom, flooring and fixture choices drive the schedule. Ordering them early keeps the crew from waiting on materials. We help you plan selections so they arrive before they’re needed.
How long a full gut renovation takes
- Bungalow: about 2 to 4 months
- 2-storey house: about 3 to 6 months, depending on the size
Living elsewhere during the job
We recommend moving out. Once the house is fully gutted there’s no power, lights or working plumbing for stretches of the job.
Budget and phasing
A full gut is a big number, and some families do it in stages. Our whole-home renovation guide goes through costs, phasing and moving out.
Real job: Project Peregrine, Brampton

This Brampton house was taken back to the studs. It came back with a new curved staircase, an open kitchen with an island, a fireplace wall with built-in shelving, a new skylight and a finished basement with its own kitchen.

Mistakes we see
Keeping old fixtures, wiring or plumbing to save money. They often don’t work well with the new systems and end up costing more later. When the walls are open, it’s the right time to replace everything that’s outdated, especially electrical and plumbing.
Questions we get asked
How long does a full gut renovation take?
About 2 to 4 months for a bungalow and 3 to 6 months for a 2-storey house.
Do I need permits for a full renovation in Toronto?
Usually yes, plus an ESA notification for the electrical.
Can I live in the house during a gut renovation?
We recommend moving out. There are stretches with no power or plumbing.
Most full gut jobs include a new kitchen, so see what a kitchen renovation costs in the GTA. Before you sign with anyone, read our 10 questions to ask before you hire a contractor.
Planning a full renovation?
Send us a few photos and a rough idea of what you want, and we’ll come out and walk the house with you. Site visits are free. See our full home renovations page and our GTA renovation guide.
Want a rough number first? Try our free renovation budget calculator, then map out the job with our renovation planner.
Call 416-995-4534, email Info@905reno.ca or book a free site visit. We stand behind every space we build.